Skip to content
Fort Lauderdale, FL · Licensed across FloridaMon–Fri 10:00 AM – 6:00 PM · (954) 807-3208
Romco Impact — BrowardCall

Broward specifics · Design Pressure

The Number That Should Be on Every Line of Your Quote

Design pressure is calculated per opening from the building, the site and the unit. It is the number that decides what may legally go in the hole, and most homeowners are never shown it.

Give us the address and a rough count of openings. We will tell you what the design pressures are before anyone quotes you a price.

HVHZ

Broward is inside the High Velocity Hurricane Zone

NOA

Miami-Dade Notice of Acceptance is the approval that governs here

Our crews

We measure, we schedule, and our own people install

Licensed

A licensed Florida general contractor

A single figure for the whole building

Pressure is not a property of the house. It is a property of each opening — its height above grade, its position relative to corners and edges, the exposure of the site, and the size of the unit itself. Corner and upper openings carry markedly higher numbers than centre-of-wall openings at ground level. A quote listing one design pressure for every window has averaged something that cannot be averaged.

What goes into the calculation

  • Ultimate design wind speed for the address.
  • Exposure category — waterfront and open ground raise it.
  • Height above grade of the specific opening.
  • Proximity to building corners and roof edges, where pressures peak.
  • The size of the unit, since approved pressure falls as area rises.

Why waterfront Broward is a different number

Exposure category is the part homeowners are least aware of. A house on open water or a wide waterway sits in a higher exposure category than an identical house four streets inland surrounded by mature trees and other buildings — and the resulting design pressures can differ substantially for the same architecture.

That is why an inland quote does not transfer to a waterfront property, and why the intracoastal and ocean-facing homes in Broward routinely need a heavier specification than their owners expect from asking neighbours what they paid.

How we handle it

  1. 01Calculate positive and negative pressure for every opening.
  2. 02Give you the schedule in writing before pricing.
  3. 03Specify units approved at or above the calculated number at that size.
  4. 04Flag openings where the wanted configuration will not hold the number.

We produce the schedule first and share it. It is a dull document — opening by opening, dimensions, height, exposure, required pressure — and it is the thing that lets you compare two quotes honestly. Once it exists, product selection becomes a matter of matching approvals to numbers rather than trusting a brand.

Said plainly

Where we stop

We are not structural engineers and do not issue engineering certification. Where a job needs sealed calculations, that is an engineer's scope and we will bring one in rather than improvise.

FAQ

Common questions

Why does my neighbour's quote differ from mine?
Exposure, height and opening layout. Two houses on the same street can carry different numbers if one is on the water and one is not, or if one has large corner openings and the other does not.
Can I just ask for the highest rating available?
You can, and it usually wastes money. The correct approach is each opening approved for its own requirement. Over-specifying the small sheltered windows buys nothing.
Should the pressures be on the permit?
The approvals and the schedule form part of the permit package. If a contractor cannot produce them, that is the question to press before signing anything.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.