Skip to content
Fort Lauderdale, FL · Licensed across FloridaMon–Fri 10:00 AM – 6:00 PM · (954) 807-3208
Romco Impact — BrowardCall

What we install · Impact Glass Retrofit

When Keeping the Frames Is the Right Answer

Replacing the glazing while keeping the existing frames. On the right building it saves real money and real disruption. On the wrong one it produces something that is not approved and cannot be made so.

Give us the address and a rough count of openings. We will tell you what the design pressures are before anyone quotes you a price.

HVHZ

Broward is inside the High Velocity Hurricane Zone

NOA

Miami-Dade Notice of Acceptance is the approval that governs here

Our crews

We measure, we schedule, and our own people install

Licensed

A licensed Florida general contractor

Retrofit sold where it does not apply

Retrofit glazing is approved as a system — a specific glass in a specific frame type with a specific glazing method. It is not a licence to put laminated glass into whatever frame is already there. Where the existing frame is aluminium of the right profile and in sound condition, a retrofit can be entirely legitimate. Where the frames are tired, the wrong section or already leaking, it produces an assembly nobody can certify and a leak nobody can fix.

What has to be true for retrofit

  • The existing frame type is covered by the retrofit approval.
  • The frames are structurally sound and correctly anchored.
  • The perimeter seal is serviceable or can be renewed.
  • The resulting assembly holds the pressure the opening needs.
  • The building does not need frames replaced for other reasons.

The buildings where this genuinely wins

Broward has a large stock of well-built mid-century and later condominium and single-family properties with heavy aluminium frames in sound condition. On those, retrofit glazing gets the protection in with far less disturbance to interiors, stucco and window treatments, and at a materially lower cost than full replacement.

It is also the option most often not offered, because full replacement is the larger sale. Where it applies, it is the right answer, and it is worth asking any contractor why they have not raised it.

How we handle it

  1. 01Inspect the frames before offering retrofit as an option at all.
  2. 02Confirm the approval covers that frame profile.
  3. 03Replace the perimeter seal as part of the work.
  4. 04Say plainly when full replacement is the only honest route.

We inspect first and give a straight answer. On a mid-century building with sound aluminium frames, retrofit is often the better job — less disruption, lower cost, same protection. On a building where the frames are the problem, retrofit is a way of spending money without solving anything, and we will say that even though the retrofit is the easier sale.

Said plainly

Where we stop

Retrofit into timber frames, or into frames that are already admitting water, is not something we will do. There is no approved path and it does not become one because the client would prefer it.

FAQ

Common questions

Is retrofit as good as full replacement?
For protection, where the approval applies and the frames are sound, yes. Where the frames are not sound it is not an option at all rather than a lesser one.
Will it look different?
Slightly. Retrofit glazing usually sits a little differently in the frame and sight lines change marginally. On most buildings it is unnoticeable; on some elevations it is worth seeing a sample first.
Can you retrofit some openings and replace others?
Yes, and on a mixed building that is often the sensible plan — retrofit where the frames are good, replace where they are not, rather than applying one approach across a building that is not uniform.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.