No Design Board Here. A Registration Rule Instead.

Nothing at city level decides how your windows look. The rules here are about who may file the permit and how.

Give us the address and a rough count of openings. We will tell you what the design pressures are before anyone quotes you a price.

HVHZ

Broward is inside the High Velocity Hurricane Zone

NOA

Miami-Dade Notice of Acceptance is the approval that governs here

Our crews

We measure, we schedule, and our own people install

Licensed

A licensed Florida general contractor

The wrong question, asked first

Homeowners here often open where friends in other cities had to open, by asking who approves the appearance of the new units. That question has a short answer. The city clerk's roster of advisory boards runs from the Affordable Housing Advisory Committee through the Planning & Zoning Board to the Unsafe Structures Board, and carries no historic preservation board, no design review board and no architectural review board at all.

There is a historical society and a museum, and both are cultural rather than regulatory. So grid pattern, frame color and sight lines are yours to choose, subject to whatever your own homeowners association has to say. Against a designated address in an older coastal city that is a real freedom, and it is worth knowing before you spend a week worrying about approvals that do not exist.

What governs a job here is procedural instead. The city's permit requirements state that 'A licensed contractor that is registered with the City of Plantation must submit an application for permit'. For anyone thinking of filing themselves: 'An owner/builder affidavit must be filled out and owner must meet with the Plan Reviewer prior to applying for any permits.' A meeting, in person, before the application exists.

What actually governs a job here

  • Registration with the city, held by the contractor before an application can be submitted at all.
  • An in-person meeting with the plan reviewer before an owner-builder applies for anything.
  • County uniform forms rather than a window package published by the city.
  • The High-Velocity Hurricane Zone Uniform Permit Application, Section 1525, among the forms applicants are routed to.
  • Your own association's rules, which are now the only thing with a view on appearance.

What the age of the stock means here

Median year of construction in the city is 1983. That sits about a decade after the coastal cities on this site and about a decade before the code changes that followed 1992, which is an awkward middle. The buildings are usually sound, and the original windows, where they are still original, are generally at the end of their service life.

It also means openings are more often standard and more often square, which makes the product question simpler than it is on an older bungalow. Where the effort goes on a job of this vintage is the anchoring and the perimeter, because that is where a retrofit either lasts or quietly does not.

How we run a job here

  1. 01Confirm city registration is current before a file is opened, since the application cannot be submitted without it.
  2. 02Build the package on the county uniform forms, including the retrofit schedule and the Section 1525 application.
  3. 03Take the appearance question to your association rather than to a city board, because there is not one to take it to.
  4. 04Book inspections through the city's portal and stand on site with the inspector.

The permit page also lists walk-thru permitting for minor permits on Monday, Wednesday and Friday from 8:00 to 10:00 in the morning. Counter hours change far more often than code does, so we confirm them before planning a filing around them rather than sending somebody to stand in a corridor at eight in the morning to find out.

Source: City of Plantation Building Safety permit forms and requirements page, and the City Clerk's boards and committees roster — checked 2026-09-24

Said plainly

Where we stop

No design board does not mean an opening can change. Enlarging one or moving it is structural work with an engineer attached, and a different permit from a retrofit. We will tell you which of the two you are actually asking for before anyone prices it.

FAQ

Common questions

Does anyone have to approve how the windows look?
Not the city. Its advisory board roster carries no historic preservation, design review or architectural review board. Your homeowners association may still have rules, and those are the ones to read.
I want to pull the permit myself. What is different here?
An owner/builder affidavit has to be completed, and the city requires the owner to meet with the plan reviewer before applying for any permits. Plan for an appointment, in person, first.
Which forms does the city use?
It routes applicants to the county uniform forms instead of publishing a window package of its own. For this trade that means the retrofit schedule, the wind load chart and the Section 1525 application.
Can I make the window bigger while it is out?
That stops being a retrofit. Changing the size or position of an opening is structural work with an engineer involved and a separate permit, and we price it as one.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.