Skip to content
Fort Lauderdale, FL · Licensed in the state of FloridaMon–Fri 10:00 AM – 6:00 PM · (954) 807-3208
Romco Impact — BrowardCall

Broward cities · Pompano Beach

In a Condominium, the Association Letter Is a Permit Document

The city's window checklist asks for the association approval letter at submittal, and closes the owner-builder route inside condominiums.

Give us the address and a rough count of openings. We will tell you what the design pressures are before anyone quotes you a price.

HVHZ

Broward is inside the High Velocity Hurricane Zone

NOA

Miami-Dade Notice of Acceptance is the approval that governs here

Our crews

We measure, we schedule, and our own people install

Licensed

A licensed Florida general contractor

The board letter treated as a courtesy

A great deal of the housing here sits inside an association, and a good share of that is in the condominium buildings along the barrier island. Owners generally assume the board's sign-off is a neighborly step that can run alongside the permit. The city's window and door submittal checklist, updated 01/29/2024, does not treat it that way. It asks the applicant to 'Submit association approval letter for the scope of work performed. (Condominiums and Homeowner Associations Only)'.

One line, and it moves the association onto the critical path. If your board meets monthly, or the building carries a uniform glazing standard nobody has read since it was adopted, the permit no longer sits behind the manufacturer. It sits behind a meeting date.

The same checklist also closes a route people reach for once the quote lands. The owner/builder affidavit note reads '(Owner/Builder not applicable for work in Condominiums)'. Inside a condominium the application is submitted by a licensed contractor, and there is no cheaper filing path underneath that.

What the checklist actually asks for

  • An association approval letter covering the scope of work, for condominiums and homeowner associations.
  • A current Miami-Dade Notice of Acceptance or Florida Product Approval, with the relevant elements circled or clouded.
  • Site-specific component-and-cladding wind loads, signed and sealed by a Design Professional, where mean roof height exceeds 30 feet.
  • The Broward County Uniform Retrofit Window & Door Schedule, which is the one part of this that is identical countywide.
  • An application number raised in the city's Click2Gov portal, with review then running electronically through ePlan.
  • One combined process where a job also needs county permits, through the city's participation in ePermitsOneStop.

The 30-foot line, and how it splits the city

This is a city with a low-rise single-family fabric and a run of tall buildings close to the water, and the checklist treats the two differently at one measurement. Below a mean roof height of 30 feet the county's voluntary fenestration wind load chart can carry the pressures. Above it, the city asks for site-specific component-and-cladding loads signed and sealed by a Design Professional, which is a separate engagement with its own fee and its own timetable.

Median year of construction is 1974, so most of the stock predates the code changes that followed 1992 by roughly two decades. On the single-family side that usually means substrate work sitting behind the window. In the older buildings it means the original glazing answered a standard nobody would specify today.

How we run a job here

  1. 01Read the association's rules and the building's glazing standard before anything is specified.
  2. 02Write the scope of work so the board can approve the same document the city will later ask to see.
  3. 03Circle or cloud the approval elements the checklist calls for instead of attaching a supplier catalog.
  4. 04Settle the wind load question by roof height early, since above 30 feet a Design Professional has to be engaged.

On a unit inside a tower the work splits cleanly in two. One half is technical and familiar: approvals, pressures, anchoring into whatever substrate is actually there. The other half is administrative, and that is the half these jobs stall in. We start the association side in the first week, because a letter has a meeting date attached to it and glass does not.

Source: City of Pompano Beach Window & Door submittal checklist, updated 01/29/2024 — checked 2026-09-24

Said plainly

Where we stop

We cannot approve your scope on the association's behalf, and we will not file condominium work under an owner-builder affidavit, because the city's own checklist says that route does not apply there. If the board will not sign the letter, the job waits for the board.

FAQ

Common questions

Can I pull the permit myself and save the markup?
Not in a condominium. The city's checklist states the owner/builder route is not applicable for work in condominiums. In a single-family house the affidavit route exists, with the usual liability attached to it.
How early should I approach my association?
Before the quote rather than after it. The approval letter is a submittal item, so a board that sits once a month can fix your start date more firmly than the manufacturer will.
Does my building need an engineer involved?
It turns on mean roof height. Above 30 feet the city asks for site-specific component-and-cladding wind loads signed and sealed by a Design Professional. Below it, the county chart usually answers the question.
Is the retrofit schedule particular to this city?
No. The Broward County Uniform Retrofit Window & Door Schedule goes to every jurisdiction in the county on the same form. That is the part of your permit file that is not local at all.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.